Weighted Decision Matrix — Pick what matters and see the winner

Drag the sliders to set how important each metric is. We normalize weights so they sum to 100%. Scores (0–10) reflect our current best judgment for each concept.

1) Set your priorities

—%
Lower capital cost preferred.
—%
Ease of staging, access, risk, schedule.
—%
In-river works, scour, fish habitat.
—%
Footprint, ROW, interface with neighbors.
—%
Tourism draw, place-making, activation.
—%
Ride feel, vibration, perceived safety.
—%
Cultural fit, height/visual impact, co-design opportunities.
—%
Inspection effort, coatings, cable upkeep.
Sum: 100%

2) Results

Current winner:

Weighted score breakdown

Metric Weight Arch Suspension Cable-Stay
Total 100%

Have your say: lock in your weights and vote for your preferred option.

Vote on the Concept