Weighted Decision Matrix — Pick what matters and see the winner
Drag the sliders to set how important each metric is. We normalize weights so they sum to 100%. Scores (0–10) reflect our current best judgment for each concept.
1) Set your priorities
Lower capital cost preferred.
Ease of staging, access, risk, schedule.
In-river works, scour, fish habitat.
Footprint, ROW, interface with neighbors.
Tourism draw, place-making, activation.
Ride feel, vibration, perceived safety.
Cultural fit, height/visual impact, co-design opportunities.
Inspection effort, coatings, cable upkeep.
Sum: 100%
2) Results
Current winner:
—
Weighted score breakdown
| Metric | Weight | Arch | Suspension | Cable-Stay |
|---|---|---|---|---|
| Total | 100% | — | — | — |
Have your say: lock in your weights and vote for your preferred option.
Vote on the Concept